Common questions

Q1: How will local roads cope with additional traffic?

All development, large or small, has an impact on existing infrastructure. Large developments can better manage and minimise those impacts compared to smaller, piecemeal development. We will minimise the impact on local roads by providing facilities on-site to reduce the need to travel (such as shops, primary school, and jobs), whilst also delivering targeted off-site improvements, and promoting sustainable, alternative means of travel.

Q2: How will schools, shops, and the doctors cope with more local residents?

The proposals include a primary school, shops, and an approach has been made to the Integrated Care Board about the potential to accommodate a new doctors surgery within the development. In terms of secondary schools, new pupils could be accommodated at Oakbank School although improvements may be required to increase its capacity. It is important that new developments make provision for new infrastructure where it is needed.

Q3: Why do we need more houses?

The population of the Borough is expected to grow by 8.9% (14,867) by 2028 from 2018 (ONS 2020), and the Borough Council have estimated a need for over 13,000 new homes to be built before 2040. The consequence of not providing sufficient housing to meet demand is higher house prices, and the average price of a home in the Borough is £511,505 compared to a national average of £292,882 (UK House Price Index, Aug 2023). The Borough Council estimate a need for 6,689 new affordable homes to be built before 2040.

Q4: What will happen to the wildlife on the land?

Ecologists have undertaken surveys of the land to identify the presence of habitats and species. The habitats on site were common and widespread with low overall ecological value, and only small parts of hedgerows would need to be removed to enable access. The proposals have been designed to accommodate space for wildlife as shown on the plans, and any planning application will need to demonstrate how improvements can be delivered.

Q5: Will development make flooding worse?

Planning permission will only be granted if a flood risk assessment is undertaken and the results are shown to be satisfactory. That means the proposed development will not flood, will not cause the surrounding areas to flood and will not have a detrimental impact on the underlying situation. The proposals will demonstrate how we will deal with water, not only to manage flood risk but achieve betterment over the current situation.

YOUR VIEWS